Our project

Doha Metro Qatar

Movares was responsible for the development of earthing system, lightning protection system, EMC interfaces and stray current analysis for Green line, elevated section, Doha Metro. Interfaces to third parties were also considered. This section includes “Al Riffa” station. The integration of all systems in the station, ranging from ICT services to railway electrification and a simple light fixture leads to numerous EMC issues, which need to be solved, as safety critical systems are involved.

RAMS and safety management

An overview of the entire system life cycle is important if one is to achieve optimum performance, as system performance will depend not just on design decisions but also on how the system is built and used.

Read more